Chinese firm puts 1st phase of Mero oilfield into production in Brazil

   2022-05-03 ecns0
核心提示:Mero oilfield Phase-I joint development project has been put into production in Brazil by China National Offshore Oil Corporation (CNOOC) Li
Mero oilfield Phase-I joint development project has been put into production in Brazil by China National Offshore Oil Corporation (CNOOC) Limited, the listed unit of China's largest producer of offshore crude oil and natural gas.Mero oilfield, about 150 km off Rio de Janeiro, is located at the Libra block in Brazil's Santos Basin pre-salt area with an average water depth of 1930 meters.Huang Yehua, president of CNOOC Brazil, said that the project is reaching its production capacity of up to 180,000 barrels per day with the first phase of the project put into production.CNOOC holds a 9.65-percent stake in the Mero oilfield joint development project.Mero oilfield Phase-I joint development project has been put into production in Brazil by China National Offshore Oil Corporation (CNOOC) Limited, the listed unit of China's largest producer of offshore crude oil and natural gas.Mero oilfield, about 150 km off Rio de Janeiro, is located at the Libra block in Brazil's Santos Basin pre-salt area with an average water depth of 1930 meters.Huang Yehua, president of CNOOC Brazil, said that the project is reaching its production capacity of up to 180,000 barrels per day with the first phase of the project put into production.CNOOC holds a 9.65-percent stake in the Mero oilfield joint development project.
 
标签: Economy
反对 0举报 0 评论 0
 

免责声明:本文仅代表作者个人观点,与好速译英语翻译(本网)无关。其原创性以及文中陈述文字和内容未经本站证实,对本文以及其中全部或者部分内容、文字的真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
    本网站有部分内容均转载自其它媒体,转载目的在于传递更多信息,并不代表本网赞同其观点和对其真实性负责,若因作品内容、知识产权、版权和其他问题,请及时提供相关证明等材料并与我们留言联系,本网站将在规定时间内给予删除等相关处理.

点击排行